About Us Technology News Cases Contact Us
Copyright © 2018 Jiangsu Longye Energy saving Technology Co.,Ltd. 苏ICP备16041874号-1
Mobile Website
CASES
The end of the sensible heat recovery calibration of the riser of No. 7 boiler in Wuhan Pingdingshan Iron and Steel Co-Coke Comp
产品描述
The 55-well riser sensible heat recovery system of No. 7 boiler in Wuhan Pingdingshan No. 5 Iron & Steel Coking Co., Ltd. has been installed since the end of October 2016 and has now been operating normally for two months. The system is operating stably. In December 2016, it passed the technical calibration of Wuhan University of Science and Technology.
Previous article
Shandong iron and steel co. LTD. Laiwu branch
Guangdong Shun Steel Co., Ltd. Matsuyama Co., Ltd. Coking Plant Riser Waste Heat Recovery Project Successfully Put into Producti
Next article